A customer requested that inovolt designed and installed a new 1600amp switch panel to their facility. These works were required to upgrade their current electrical supply infrastructure.
Work carried out included;
- High level containment systems.
- Rerouting of new sub main to supply existing and new distribution boards.
inovolt’s building division carried out all associated ground works for the new transformer installation and cabling. The electrical team ensured full communication with SSE from the start of the project through to its completion.