• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
inovolt Ltd

inovolt Ltd

inovolt Ltd

admin@inovolt.co.uk

023 9249 2191

  • Home
  • Why Choose Inovolt
  • Accreditations
  • Services
    • Electrical
    • Mechanical & HVAC
    • Building Fabrications
    • Facilities Maintenance Services
  • News
  • Customer Portal
  • Contact

inovolt

A Responsive, Professional Company.

August 17, 2020 By inovolt Leave a Comment

How a new customer described inovolt, after using our emergency out of hours service. The customer discovered a large leak in their plant room and placed an emergency call out with inovolt.

inovolt pride themselves on their response rate and service. Aiming to keep to an average response time of 2 hours, wherever possible.

Emergency call out received on Friday.

The customers called on Friday morning, to report a large leak in their plant room. The call was received at 7.15am by the mechanical out of hours line, inovolt’s engineer was onsite by 7.40am.

On arrival inovolt’s mechanical engineer found a leak steaming from the water softener pipework. The engineer quickly determined that the pipework had not been correctly supported. This had caused stress on the joints, which lead to the snapping of the fitting.

incorrectly supported pipework.

inovolt’s engineer discovered that water had penetrated the control panel. inovolt’s mechanical engineer called for an electrical engineer to be sent to site.

Further issues

Unfortunately it was found that a large amount of water had penetrated the control panel. Another electrical engineer was deployed to help dry out the panel. The drying process included uses of the wet vac, heat and driers.

Once the control panel was thoroughly dried the fault finding begun. inovolt’s engineers were onsite late into the evening reinstating power to the customers site. Working tirelessly to get our customer back up and running finally leaving site at around 11.30pm.

Customer Feedback

On returning to the office on Monday inovolt had received fantastic reviews via google and social media pages.

inovolt have a building division, along with a mechanical and electrical division. Enabling them to provide a full range of building, mechanical and electrical services. Covering all project works, installations, servicing and emergency call outs.

Filed Under: Uncategorized

Electrical Mains Upgrade

July 12, 2019 By inovolt Leave a Comment

A customer requested that inovolt to designed and installed a new 1600amp switch panel to their facility.  These works were required to upgrade their current electrical supply infrastructure.

 

Work carried out included;

  • High level containment systems.
  • Rerouting of new sub main to supply existing and new distribution boards.

                    

inovolt’s building division carried out all associated ground works for the new transformer installation and cabling.  the electrical team ensured full liaison with SSE from the start of the project through to its completion.

Filed Under: Uncategorized

Autocalve installation project at customer’s site

May 30, 2019 By inovolt Leave a Comment

Scope of works.

As part of further investment due to recently secured projects.  A customer asked if we would design and install,  power and cooling for two brand new autoclaves, at their composite production facility.

Project requirements.

  • Installation of a new concrete pad to site.
  • Cooling equipment.
  • Installation and commissioning of an adiabatic chiller and pipework to serve both autoclaves.
  • To install electrical supplies and control systems.
  • The Installation of bespoke containment systems to serve both mechanical and electrical

This project was completed within 6 weeks.  Our three Divisions, building, mechanical & electrical, are able to cater for all of your Facilities maintenance services.

Able to carry out projects of all sizes.  inovolt are also set up to maintain your facility, with a full range of services.  We also provide 24/7 emergency call out cover to our customers.  With an average response time of two hours, we are there when you need us.

Filed Under: News Tagged With: facilities management, facilities services, facman

Clean Room Intsallation

April 23, 2019 By inovolt 2 Comments

A customer asked inovolt to design and install a large clean room and bonding facility.

The Facilities clean room was constructed from plasterboard partition walls, incorporating structural steel work.  The room was built with a fully insulated suspended ceiling.  Our building division finished with vinyl flooring.

Our customer required the help of  inovolts electrical team to design the lighting within the clean room,  to maintain a high output level of 1000 Lux   Our mechanical team also installed a full air conditioning system.  The system was designed and installed to meet the customers temperature requirement.

 

                                    

 

Following a customers specification inovolt are able to undertake all project work, designing, managing and installing the whole concept from start to finish.  Inovolt are also able to provide a full range of facilities maintenance services to increase the longevity of all assets.

 

 

 

 

Filed Under: Uncategorized

Primary Sidebar

Categories

  • News
  • Uncategorized

Archives

  • August 2020
  • July 2019
  • May 2019
  • April 2019
  • February 2019

Recent Posts

  • A Responsive, Professional Company.
  • Electrical Mains Upgrade
  • Autocalve installation project at customer’s site
  • Clean Room Intsallation
  • New Website

Footer Widget Header

Copyright © 2021 · inovolt · Visit inovad · Website Designed by Pink Fin · Privacy Policy
  • Home
  • Why Choose Inovolt
  • Accreditations
  • Services
    • Electrical
    • Mechanical & HVAC
    • Building Fabrications
    • Facilities Maintenance Services
  • News
  • Customer Portal
  • Contact